What it costs to charge a 2026 Lucid Gravity Dream w/22F23R wheels (3R) in Arizona
In Arizona, home electricity runs 15.45¢/kWh — put a 2026 Lucid Gravity Dream w/22F23R wheels (3R)'s EPA-rated 37.6 kWh/100mi against that and 100 miles costs $5.82, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 63.7% cheaper per mile than gasoline in Arizona — charging at home is much cheaper than gas here.
Annual cost, at 15 thousands miles a year
Home charging this 2026 Lucid Gravity Dream w/22F23R wheels (3R) in Arizona runs about $872 over fueleconomy.gov's default 15,000 annual miles, versus about $2,403 for the gasoline equivalent. Call it about $1,531 saved annually, at this mileage.
Cost of a full charge
$21.98 — that's what Arizona's 15.45¢/kWh rate puts on the 142.3 kWh a 2026 Lucid Gravity Dream w/22F23R wheels (3R) needs for its full 378-mile EPA range.
2026 Lucid Gravity Dream w/22F23R wheels (3R) in Arizona, ranked
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Lucid Gravity Dream w/22F23R wheels (3R) in Arizona ranks 8,516 for cost savings versus gas — 1 being the best deal nationally. Separately, the Lucid Gravity Dream w/22F23R wheels (3R) ranks 208 of 400 EV models for raw efficiency, and Arizona ranks 25 of 51 for cheapest residential electricity.
Getting set up to charge a 2026 Lucid Gravity Dream w/22F23R wheels (3R) at home
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Line up a few Arizona electrician quotes for Level 2 install before you commit either way.
More on how this number was built
See the methodology guide for exactly which EIA and EPA figures feed 2026 Lucid Gravity Dream w/22F23R wheels (3R)'s cost in Arizona. Arizona's 15.45¢/kWh rate ranks 25 of 51 states; the state rate guide lays out the full spread.