ChargeCostFinder

Connecticut home charging cost for the 2027 Rivian R1T Quad (20in AT)

In Connecticut, home electricity runs 28.82¢/kWh — put a 2027 Rivian R1T Quad (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $14.44, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home costs a little less than gas here: 9.9% less than gas per mile, here specifically.

What a year of driving costs

At fueleconomy.gov's default of 15,000 annual miles, the 2027 Rivian R1T Quad (20in AT) costs roughly $2,166 a year to charge at home in Connecticut, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $237 a year.

Filling up the 2027 Rivian R1T Quad (20in AT), in dollars

Covering the 2027 Rivian R1T Quad (20in AT)'s EPA-rated 325-mile range takes about 162.8 kWh, which costs about $46.93 at Connecticut's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

2027 Rivian R1T Quad (20in AT) in Connecticut, ranked

This combination ranks 19,908 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1T Quad (20in AT) alone ranks 391 of 400 models for efficiency; Connecticut alone ranks 45 of 51 states for electricity price.

Getting set up to charge a 2027 Rivian R1T Quad (20in AT) at home

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Ask a licensed Connecticut electrician to quote the install before this math becomes a real decision.

Where these figures come from

See the methodology guide for exactly which EIA and EPA figures feed 2027 Rivian R1T Quad (20in AT)'s cost in Connecticut. Curious how Connecticut's 28.82¢/kWh compares? The guide to charging cost by state ranks every state side by side.