ChargeCostFinder

2026 Toyota bZ (energy capacity 191 Ah): home charging cost in Connecticut

At Connecticut's residential electricity rate of 28.82¢/kWh, a 2026 Toyota bZ (energy capacity 191 Ah) (rated 25.5 kWh per 100 miles by the EPA) costs $7.35 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home is much cheaper than gas here: 54.1% less than gas per mile, here specifically.

2026 Toyota bZ (energy capacity 191 Ah): yearly cost in Connecticut

Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Toyota bZ (energy capacity 191 Ah) charged at home in Connecticut costs about $1,103/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,300 a year.

What one full charge costs

A 2026 Toyota bZ (energy capacity 191 Ah) needs roughly 80.1 kWh to reach its EPA-rated 314-mile range, which runs about $23.08 at 28.82¢/kWh in Connecticut.

Where this ranks

This combination ranks 13,885 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ (energy capacity 191 Ah) alone ranks 7 of 400 models for efficiency; Connecticut alone ranks 45 of 51 states for electricity price.

Getting set up to charge a 2026 Toyota bZ (energy capacity 191 Ah) at home

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Get quotes from local electricians for Level 2 charger installation in Connecticut before deciding.

Where these figures come from

See the methodology guide for exactly which EIA and EPA figures feed 2026 Toyota bZ (energy capacity 191 Ah)'s cost in Connecticut. Connecticut's 28.82¢/kWh rate ranks 45 of 51 states; the state rate guide lays out the full spread.