ChargeCostFinder

Charging a 2026 Toyota bZ (energy capacity 200 Ah) at home in Connecticut

In Connecticut, home electricity runs 28.82¢/kWh — put a 2026 Toyota bZ (energy capacity 200 Ah)'s EPA-rated 25.8 kWh/100mi against that and 100 miles costs $7.45, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 53.5% cheaper per mile than gasoline in Connecticut — charging at home is much cheaper than gas here.

What a year of driving costs

Connecticut owners putting 15,000 annual miles on a 2026 Toyota bZ (energy capacity 200 Ah) spend about $1,117 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,286 saved annually, at this mileage.

What one full charge costs

At Connecticut's rate, fully covering this 2026 Toyota bZ (energy capacity 200 Ah)'s 236-mile EPA range costs about $17.57 (61 kWh) — the energy the EPA test actually used, not the battery's rated size.

How this compares nationally

Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Toyota bZ (energy capacity 200 Ah) in Connecticut ranks 14,085 for cost savings versus gas — 1 being the best deal nationally. Separately, the Toyota bZ (energy capacity 200 Ah) ranks 10 of 400 EV models for raw efficiency, and Connecticut ranks 45 of 51 for cheapest residential electricity.

Next step: home charger installation

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Ask a licensed Connecticut electrician to quote the install before this math becomes a real decision.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Connecticut's 28.82¢/kWh rate ranks 45 of 51 states; the state rate guide lays out the full spread.