2027 Chevrolet Equinox EV AWD: home charging cost in District of Columbia
In District of Columbia, home electricity runs 24.54¢/kWh — put a 2027 Chevrolet Equinox EV AWD's EPA-rated 32.6 kWh/100mi against that and 100 miles costs $8, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 50% less than gas per mile, here specifically.
Annual cost, at 15 thousands miles a year
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2027 Chevrolet Equinox EV AWD charged at home in District of Columbia costs about $1,201/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,202 a year.
What one full charge costs
A 2027 Chevrolet Equinox EV AWD needs roughly 100.1 kWh to reach its EPA-rated 307-mile range, which runs about $24.57 at 24.54¢/kWh in District of Columbia.
Where this ranks
This combination ranks 15,060 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Chevrolet Equinox EV AWD alone ranks 104 of 400 models for efficiency; District of Columbia alone ranks 42 of 51 states for electricity price.
Before you install a home charger in District of Columbia
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Get quotes from local electricians for Level 2 charger installation in District of Columbia before deciding.
Where these figures come from
The methodology guide names the exact EIA and EPA tables behind this page's numbers. District of Columbia's 24.54¢/kWh rate ranks 42 of 51 states; the state rate guide lays out the full spread.