ChargeCostFinder

2026 Toyota bZ (energy capacity 191 Ah), DC Charging Cost

District of Columbia home charging cost for the 2026 Toyota bZ (energy capacity 191 Ah)

At District of Columbia's residential electricity rate of 24.54¢/kWh, a 2026 Toyota bZ (energy capacity 191 Ah) (rated 25.5 kWh per 100 miles by the EPA) costs $6.26 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home is much cheaper than gas here: 60.9% less than gas per mile, here specifically.

What a year of driving costs

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Toyota bZ (energy capacity 191 Ah) costs roughly $939 a year to charge at home in District of Columbia, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,464 a year.

What one full charge costs

Covering the 2026 Toyota bZ (energy capacity 191 Ah)'s EPA-rated 314-mile range takes about 80.1 kWh, which costs about $19.65 at District of Columbia's residential rate, figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

Where this ranks

This combination ranks 10,537 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ (energy capacity 191 Ah) alone ranks 7 of 400 models for efficiency; District of Columbia alone ranks 42 of 51 states for electricity price.

Next step: home charger installation

The numbers above assume Level 2 home charging is already in place, the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Line up a few District of Columbia electrician quotes for Level 2 install before you commit either way.

Where these figures come from

The methodology guide names the exact EIA and EPA tables behind this page's numbers. District of Columbia's 24.54¢/kWh rate ranks 42 of 51 states; the state rate guide lays out the full spread.