2026 Jeep Recon MOAB 4WD, GA Charging Cost
Georgia home charging cost for the 2026 Jeep Recon MOAB 4WD
A 2026 Jeep Recon MOAB 4WD draws 47.6 kWh per 100 miles per the EPA; at Georgia's 15.19¢/kWh residential rate that's $7.22 per 100 miles charged at home, versus $16.02 for a 25.5-mpg gas car covering the same distance. Charging at home is much cheaper than gas here: 54.9% less than gas per mile, here specifically.
What a year of driving costs
At fueleconomy.gov's default of 15,000 annual miles, the 2026 Jeep Recon MOAB 4WD costs roughly $1,084 a year to charge at home in Georgia, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,319 a year.
Cost of a full charge
Covering the 2026 Jeep Recon MOAB 4WD's EPA-rated 222-mile range takes about 105.6 kWh, which costs about $16.04 at Georgia's residential rate, figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.
2026 Jeep Recon MOAB 4WD in Georgia, ranked
This combination ranks 13,624 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Jeep Recon MOAB 4WD alone ranks 376 of 400 models for efficiency; Georgia alone ranks 19 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place, the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Line up a few Georgia electrician quotes for Level 2 install before you commit either way.
Where these figures come from
Every figure on this page traces to a named EIA or EPA dataset, see the methodology guide. At 15.19¢/kWh, Georgia sits in the middle of the national range, the guide to why charging cost varies by state shows where.