ChargeCostFinder

Charging a 2026 Rivian R1S Quad Max (20in AT) at home in Georgia

At Georgia's residential electricity rate of 15.19¢/kWh, a 2026 Rivian R1S Quad Max (20in AT) (rated 50.1 kWh per 100 miles by the EPA) costs $7.61 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. That works out to 52.5% cheaper per mile than gasoline in Georgia — charging at home is much cheaper than gas here.

What a year of driving costs

Georgia owners putting 15,000 annual miles on a 2026 Rivian R1S Quad Max (20in AT) spend about $1,142 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,261 saved annually, at this mileage.

Filling up the 2026 Rivian R1S Quad Max (20in AT), in dollars

At Georgia's rate, fully covering this 2026 Rivian R1S Quad Max (20in AT)'s 325-mile EPA range costs about $24.73 (162.8 kWh) — the energy the EPA test actually used, not the battery's rated size.

How this compares nationally

Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Rivian R1S Quad Max (20in AT) in Georgia ranks 14,386 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1S Quad Max (20in AT) ranks 392 of 400 EV models for raw efficiency, and Georgia ranks 19 of 51 for cheapest residential electricity.

Before you install a home charger in Georgia

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Get quotes from local electricians for Level 2 charger installation in Georgia before deciding.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Georgia's 15.19¢/kWh rate ranks 19 of 51 states; the state rate guide lays out the full spread.