ChargeCostFinder

What it costs to charge a 2026 Polestar 4 Long Range Dual Motor in Maine

A 2026 Polestar 4 Long Range Dual Motor draws 40 kWh per 100 miles per the EPA; at Maine's 29.67¢/kWh residential rate that's $11.87 per 100 miles charged at home, versus $16.02 for a 25.5-mpg gas car covering the same distance. That works out to 25.9% cheaper per mile than gasoline in Maine — charging at home is cheaper than gas here.

What a year of driving costs

Home charging this 2026 Polestar 4 Long Range Dual Motor in Maine runs about $1,780 over fueleconomy.gov's default 15,000 annual miles, versus about $2,403 for the gasoline equivalent. Call it about $623 saved annually, at this mileage.

Cost of a full charge

$33.23 — that's what Maine's 29.67¢/kWh rate puts on the 112 kWh a 2026 Polestar 4 Long Range Dual Motor needs for its full 280-mile EPA range.

2026 Polestar 4 Long Range Dual Motor in Maine, ranked

Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Polestar 4 Long Range Dual Motor in Maine ranks 18,945 for cost savings versus gas — 1 being the best deal nationally. Separately, the Polestar 4 Long Range Dual Motor ranks 270 of 400 EV models for raw efficiency, and Maine ranks 48 of 51 for cheapest residential electricity.

Next step: home charger installation

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Line up a few Maine electrician quotes for Level 2 install before you commit either way.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Maine has some of the highest residential electricity rates in the country — see the guide to why the cost varies so much by state for the full picture.