Charging a 2026 Ford Mustang Mach-E GT at home in Maryland
In Maryland, home electricity runs 21.27¢/kWh — put a 2026 Ford Mustang Mach-E GT's EPA-rated 37.4 kWh/100mi against that and 100 miles costs $7.95, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 50.4% cheaper per mile than gasoline in Maryland — charging at home is much cheaper than gas here.
What a year of driving costs
Maryland owners putting 15,000 annual miles on a 2026 Ford Mustang Mach-E GT spend about $1,193 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,210 saved annually, at this mileage.
Cost of a full charge
At Maryland's rate, fully covering this 2026 Ford Mustang Mach-E GT's 280-mile EPA range costs about $22.27 (104.7 kWh) — the energy the EPA test actually used, not the battery's rated size.
How this compares nationally
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Ford Mustang Mach-E GT in Maryland ranks 14,955 for cost savings versus gas — 1 being the best deal nationally. Separately, the Ford Mustang Mach-E GT ranks 202 of 400 EV models for raw efficiency, and Maryland ranks 39 of 51 for cheapest residential electricity.
Getting set up to charge a 2026 Ford Mustang Mach-E GT at home
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Line up a few Maryland electrician quotes for Level 2 install before you commit either way.
More on how this number was built
The methodology guide names the exact EIA and EPA tables behind this page's numbers. Maryland's 21.27¢/kWh rate ranks 39 of 51 states; the state rate guide lays out the full spread.