Charging a 2026 Rivian R1T Dual Large Plus (20in) at home in Massachusetts
In Massachusetts, home electricity runs 30.06¢/kWh — put a 2026 Rivian R1T Dual Large Plus (20in)'s EPA-rated 43.1 kWh/100mi against that and 100 miles costs $12.96, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 19.1% cheaper per mile than gasoline in Massachusetts — charging at home is cheaper than gas here.
What a year of driving costs
Massachusetts owners putting 15,000 annual miles on a 2026 Rivian R1T Dual Large Plus (20in) spend about $1,944 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $458 saved annually, at this mileage.
Cost of a full charge
At Massachusetts's rate, fully covering this 2026 Rivian R1T Dual Large Plus (20in)'s 317-mile EPA range costs about $41.09 (136.7 kWh) — the energy the EPA test actually used, not the battery's rated size.
Where this ranks
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Rivian R1T Dual Large Plus (20in) in Massachusetts ranks 19,520 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1T Dual Large Plus (20in) ranks 329 of 400 EV models for raw efficiency, and Massachusetts ranks 49 of 51 for cheapest residential electricity.
Before you install a home charger in Massachusetts
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Line up a few Massachusetts electrician quotes for Level 2 install before you commit either way.
More on how this number was built
See the methodology guide for exactly which EIA and EPA figures feed 2026 Rivian R1T Dual Large Plus (20in)'s cost in Massachusetts. Massachusetts has some of the highest residential electricity rates in the country — see the guide to why the cost varies so much by state for the full picture.