ChargeCostFinder

2026 Rivian R1T Quad Max (20in AT), MA Charging Cost

Massachusetts home charging cost for the 2026 Rivian R1T Quad Max (20in AT)

In Massachusetts, home electricity runs 30.06¢/kWh, put a 2026 Rivian R1T Quad Max (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $15.06, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home costs a little less than gas here: 6% less than gas per mile, here specifically.

What a year of driving costs

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Rivian R1T Quad Max (20in AT) costs roughly $2,259 a year to charge at home in Massachusetts, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $144 a year.

What one full charge costs

Covering the 2026 Rivian R1T Quad Max (20in AT)'s EPA-rated 325-mile range takes about 162.8 kWh, which costs about $48.95 at Massachusetts's residential rate, figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

Where this ranks

This combination ranks 20,027 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1T Quad Max (20in AT) alone ranks 393 of 400 models for efficiency; Massachusetts alone ranks 49 of 51 states for electricity price.

Getting set up to charge a 2026 Rivian R1T Quad Max (20in AT) at home

The numbers above assume Level 2 home charging is already in place, the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Get quotes from local electricians for Level 2 charger installation in Massachusetts before deciding.

Where these figures come from

Every figure on this page traces to a named EIA or EPA dataset, see the methodology guide. Massachusetts has some of the highest residential electricity rates in the country, see the guide to why the cost varies so much by state for the full picture.