2026 Rivian R1T Quad Max (22in UHP): home charging cost in Massachusetts
In Massachusetts, home electricity runs 30.06¢/kWh — put a 2026 Rivian R1T Quad Max (22in UHP)'s EPA-rated 47.3 kWh/100mi against that and 100 miles costs $14.23, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home costs a little less than gas here: 11.2% less than gas per mile, here specifically.
2026 Rivian R1T Quad Max (22in UHP): yearly cost in Massachusetts
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Rivian R1T Quad Max (22in UHP) charged at home in Massachusetts costs about $2,135/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $268 a year.
Cost of a full charge
A 2026 Rivian R1T Quad Max (22in UHP) needs roughly 160 kWh to reach its EPA-rated 338-mile range, which runs about $48.11 at 30.06¢/kWh in Massachusetts.
How this compares nationally
This combination ranks 19,866 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1T Quad Max (22in UHP) alone ranks 374 of 400 models for efficiency; Massachusetts alone ranks 49 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Line up a few Massachusetts electrician quotes for Level 2 install before you commit either way.
Where these figures come from
See the methodology guide for exactly which EIA and EPA figures feed 2026 Rivian R1T Quad Max (22in UHP)'s cost in Massachusetts. Massachusetts has some of the highest residential electricity rates in the country — see the guide to why the cost varies so much by state for the full picture.