Charging a 2026 Porsche Taycan GTS at home in Missouri
In Missouri, home electricity runs 13.45¢/kWh — put a 2026 Porsche Taycan GTS's EPA-rated 39 kWh/100mi against that and 100 miles costs $5.24, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 67.3% cheaper per mile than gasoline in Missouri — charging at home costs a fraction of what gas would here.
2026 Porsche Taycan GTS: yearly cost in Missouri
Missouri owners putting 15,000 annual miles on a 2026 Porsche Taycan GTS spend about $786 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,617 saved annually, at this mileage.
Cost of a full charge
At Missouri's rate, fully covering this 2026 Porsche Taycan GTS's 293-mile EPA range costs about $15.36 (114.2 kWh) — the energy the EPA test actually used, not the battery's rated size.
How this compares nationally
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Porsche Taycan GTS in Missouri ranks 5,643 for cost savings versus gas — 1 being the best deal nationally. Separately, the Porsche Taycan GTS ranks 237 of 400 EV models for raw efficiency, and Missouri ranks 7 of 51 for cheapest residential electricity.
Next step: home charger installation
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Get quotes from local electricians for Level 2 charger installation in Missouri before deciding.
More on how this number was built
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Missouri's 13.45¢/kWh rate ranks 7 of 51 states; the state rate guide lays out the full spread.