ChargeCostFinder

Missouri home charging cost for the 2026 Rivian R1S Quad Max (20in AT)

In Missouri, home electricity runs 13.45¢/kWh — put a 2026 Rivian R1S Quad Max (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $6.74, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 57.9% less than gas per mile, here specifically.

2026 Rivian R1S Quad Max (20in AT): yearly cost in Missouri

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Rivian R1S Quad Max (20in AT) costs roughly $1,011 a year to charge at home in Missouri, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,392 a year.

Filling up the 2026 Rivian R1S Quad Max (20in AT), in dollars

Covering the 2026 Rivian R1S Quad Max (20in AT)'s EPA-rated 325-mile range takes about 162.8 kWh, which costs about $21.9 at Missouri's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

2026 Rivian R1S Quad Max (20in AT) in Missouri, ranked

This combination ranks 12,313 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1S Quad Max (20in AT) alone ranks 392 of 400 models for efficiency; Missouri alone ranks 7 of 51 states for electricity price.

Next step: home charger installation

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Line up a few Missouri electrician quotes for Level 2 install before you commit either way.

Where these figures come from

The methodology guide names the exact EIA and EPA tables behind this page's numbers. Curious how Missouri's 13.45¢/kWh compares? The guide to charging cost by state ranks every state side by side.