ChargeCostFinder

Missouri home charging cost for the 2026 Toyota bZ AWD LIMITED

A 2026 Toyota bZ AWD LIMITED draws 28.9 kWh per 100 miles per the EPA; at Missouri's 13.45¢/kWh residential rate that's $3.89 per 100 miles charged at home, versus $16.02 for a 25.5-mpg gas car covering the same distance. Charging at home costs a fraction of what gas would here: 75.7% less than gas per mile, here specifically.

Annual cost, at 15 thousands miles a year

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Toyota bZ AWD LIMITED costs roughly $584 a year to charge at home in Missouri, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,819 a year.

Filling up the 2026 Toyota bZ AWD LIMITED, in dollars

Covering the 2026 Toyota bZ AWD LIMITED's EPA-rated 278-mile range takes about 80.4 kWh, which costs about $10.81 at Missouri's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

How this compares nationally

This combination ranks 702 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ AWD LIMITED alone ranks 36 of 400 models for efficiency; Missouri alone ranks 7 of 51 states for electricity price.

Before you install a home charger in Missouri

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Line up a few Missouri electrician quotes for Level 2 install before you commit either way.

Where these figures come from

See the methodology guide for exactly which EIA and EPA figures feed 2026 Toyota bZ AWD LIMITED's cost in Missouri. At 13.45¢/kWh, Missouri sits in the middle of the national range — the guide to why charging cost varies by state shows where.