2026 Toyota bZ LIMITED (energy capacity 200 Ah): home charging cost in Missouri
At Missouri's residential electricity rate of 13.45¢/kWh, a 2026 Toyota bZ LIMITED (energy capacity 200 Ah) (rated 27.5 kWh per 100 miles by the EPA) costs $3.7 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home costs a fraction of what gas would here: 76.9% less than gas per mile, here specifically.
2026 Toyota bZ LIMITED (energy capacity 200 Ah): yearly cost in Missouri
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Toyota bZ LIMITED (energy capacity 200 Ah) charged at home in Missouri costs about $555/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,848 a year.
What one full charge costs
A 2026 Toyota bZ LIMITED (energy capacity 200 Ah) needs roughly 81.4 kWh to reach its EPA-rated 296-mile range, which runs about $10.94 at 13.45¢/kWh in Missouri.
Where this ranks
This combination ranks 391 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ LIMITED (energy capacity 200 Ah) alone ranks 22 of 400 models for efficiency; Missouri alone ranks 7 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Get quotes from local electricians for Level 2 charger installation in Missouri before deciding.
Where these figures come from
The methodology guide names the exact EIA and EPA tables behind this page's numbers. At 13.45¢/kWh, Missouri sits in the middle of the national range — the guide to why charging cost varies by state shows where.