ChargeCostFinder

Charging a 2026 Toyota bZ (energy capacity 200 Ah) at home in New Jersey

A 2026 Toyota bZ (energy capacity 200 Ah) draws 25.8 kWh per 100 miles per the EPA; at New Jersey's 23.65¢/kWh residential rate that's $6.11 per 100 miles charged at home, versus $16.02 for a 25.5-mpg gas car covering the same distance. That works out to 61.9% cheaper per mile than gasoline in New Jersey — charging at home is much cheaper than gas here.

2026 Toyota bZ (energy capacity 200 Ah): yearly cost in New Jersey

New Jersey owners putting 15,000 annual miles on a 2026 Toyota bZ (energy capacity 200 Ah) spend about $917 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,486 saved annually, at this mileage.

What one full charge costs

At New Jersey's rate, fully covering this 2026 Toyota bZ (energy capacity 200 Ah)'s 236-mile EPA range costs about $14.42 (61 kWh) — the energy the EPA test actually used, not the battery's rated size.

Where this ranks

Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Toyota bZ (energy capacity 200 Ah) in New Jersey ranks 9,919 for cost savings versus gas — 1 being the best deal nationally. Separately, the Toyota bZ (energy capacity 200 Ah) ranks 10 of 400 EV models for raw efficiency, and New Jersey ranks 40 of 51 for cheapest residential electricity.

Getting set up to charge a 2026 Toyota bZ (energy capacity 200 Ah) at home

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Get quotes from local electricians for Level 2 charger installation in New Jersey before deciding.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. At 23.65¢/kWh, New Jersey sits in the middle of the national range — the guide to why charging cost varies by state shows where.