ChargeCostFinder

2026 Toyota bZ LIMITED (energy capacity 200 Ah): home charging cost in New Jersey

In New Jersey, home electricity runs 23.65¢/kWh — put a 2026 Toyota bZ LIMITED (energy capacity 200 Ah)'s EPA-rated 27.5 kWh/100mi against that and 100 miles costs $6.5, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 59.4% less than gas per mile, here specifically.

What a year of driving costs

Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Toyota bZ LIMITED (energy capacity 200 Ah) charged at home in New Jersey costs about $975/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,428 a year.

What one full charge costs

A 2026 Toyota bZ LIMITED (energy capacity 200 Ah) needs roughly 81.4 kWh to reach its EPA-rated 296-mile range, which runs about $19.24 at 23.65¢/kWh in New Jersey.

How this compares nationally

This combination ranks 11,460 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ LIMITED (energy capacity 200 Ah) alone ranks 22 of 400 models for efficiency; New Jersey alone ranks 40 of 51 states for electricity price.

Before you install a home charger in New Jersey

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Line up a few New Jersey electrician quotes for Level 2 install before you commit either way.

Where these figures come from

See the methodology guide for exactly which EIA and EPA figures feed 2026 Toyota bZ LIMITED (energy capacity 200 Ah)'s cost in New Jersey. Curious how New Jersey's 23.65¢/kWh compares? The guide to charging cost by state ranks every state side by side.