ChargeCostFinder

Charging a 2027 Rivian R1T Quad (20in AT) at home in New Mexico

In New Mexico, home electricity runs 14.82¢/kWh — put a 2027 Rivian R1T Quad (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $7.43, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 53.6% cheaper per mile than gasoline in New Mexico — charging at home is much cheaper than gas here.

What a year of driving costs

New Mexico owners putting 15,000 annual miles on a 2027 Rivian R1T Quad (20in AT) spend about $1,114 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,289 saved annually, at this mileage.

What one full charge costs

At New Mexico's rate, fully covering this 2027 Rivian R1T Quad (20in AT)'s 325-mile EPA range costs about $24.13 (162.8 kWh) — the energy the EPA test actually used, not the battery's rated size.

Where this ranks

Among all 20,400 state-and-model combinations this site tracks, charging a 2027 Rivian R1T Quad (20in AT) in New Mexico ranks 14,071 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1T Quad (20in AT) ranks 391 of 400 EV models for raw efficiency, and New Mexico ranks 17 of 51 for cheapest residential electricity.

Getting set up to charge a 2027 Rivian R1T Quad (20in AT) at home

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Ask a licensed New Mexico electrician to quote the install before this math becomes a real decision.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. New Mexico's 14.82¢/kWh rate ranks 17 of 51 states; the state rate guide lays out the full spread.