2026 Toyota bZ Woodland AWD 235/60R18: home charging cost in New York
In New York, home electricity runs 29.26¢/kWh — put a 2026 Toyota bZ Woodland AWD 235/60R18's EPA-rated 29 kWh/100mi against that and 100 miles costs $8.49, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 47% less than gas per mile, here specifically.
What a year of driving costs
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Toyota bZ Woodland AWD 235/60R18 charged at home in New York costs about $1,273/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,130 a year.
What one full charge costs
A 2026 Toyota bZ Woodland AWD 235/60R18 needs roughly 81.5 kWh to reach its EPA-rated 281-mile range, which runs about $23.84 at 29.26¢/kWh in New York.
Where this ranks
This combination ranks 15,779 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ Woodland AWD 235/60R18 alone ranks 43 of 400 models for efficiency; New York alone ranks 46 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Line up a few New York electrician quotes for Level 2 install before you commit either way.
Where these figures come from
The methodology guide names the exact EIA and EPA tables behind this page's numbers. New York's 29.26¢/kWh rate ranks 46 of 51 states; the state rate guide lays out the full spread.