2027 Hyundai Ioniq 5 AWD (19inch Wheels): home charging cost in North Dakota
At North Dakota's residential electricity rate of 12.19¢/kWh, a 2027 Hyundai Ioniq 5 AWD (19inch Wheels) (rated 31.7 kWh per 100 miles by the EPA) costs $3.86 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home costs a fraction of what gas would here: 75.9% less than gas per mile, here specifically.
What a year of driving costs
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2027 Hyundai Ioniq 5 AWD (19inch Wheels) charged at home in North Dakota costs about $579/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,824 a year.
Cost of a full charge
A 2027 Hyundai Ioniq 5 AWD (19inch Wheels) needs roughly 91.8 kWh to reach its EPA-rated 290-mile range, which runs about $11.19 at 12.19¢/kWh in North Dakota.
How this compares nationally
This combination ranks 620 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Hyundai Ioniq 5 AWD (19inch Wheels) alone ranks 81 of 400 models for efficiency; North Dakota alone ranks 1 of 51 states for electricity price.
Before you install a home charger in North Dakota
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Ask a licensed North Dakota electrician to quote the install before this math becomes a real decision.
Where these figures come from
See the methodology guide for exactly which EIA and EPA figures feed 2027 Hyundai Ioniq 5 AWD (19inch Wheels)'s cost in North Dakota. North Dakota is one of the cheapest states for home electricity — the guide to why the cost varies so much by state covers what drives that.