Ohio home charging cost for the 2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels)
In Ohio, home electricity runs 18.53¢/kWh — put a 2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels)'s EPA-rated 41.5 kWh/100mi against that and 100 miles costs $7.7, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 51.9% less than gas per mile, here specifically.
2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels): yearly cost in Ohio
At fueleconomy.gov's default of 15,000 annual miles, the 2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels) costs roughly $1,155 a year to charge at home in Ohio, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,248 a year.
Filling up the 2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels), in dollars
Covering the 2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels)'s EPA-rated 281-mile range takes about 116.8 kWh, which costs about $21.63 at Ohio's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.
2026 Polestar 3 Long Range Dual Motor (22 Inch Wheels) in Ohio, ranked
This combination ranks 14,584 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Polestar 3 Long Range Dual Motor (22 Inch Wheels) alone ranks 290 of 400 models for efficiency; Ohio alone ranks 34 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Ask a licensed Ohio electrician to quote the install before this math becomes a real decision.
Where these figures come from
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Curious how Ohio's 18.53¢/kWh compares? The guide to charging cost by state ranks every state side by side.