What it costs to charge a 2026 Toyota bZ (energy capacity 200 Ah) in Ohio
In Ohio, home electricity runs 18.53¢/kWh — put a 2026 Toyota bZ (energy capacity 200 Ah)'s EPA-rated 25.8 kWh/100mi against that and 100 miles costs $4.79, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 70.1% cheaper per mile than gasoline in Ohio — charging at home costs a fraction of what gas would here.
Annual cost, at 15 thousands miles a year
Home charging this 2026 Toyota bZ (energy capacity 200 Ah) in Ohio runs about $718 over fueleconomy.gov's default 15,000 annual miles, versus about $2,403 for the gasoline equivalent. Call it about $1,685 saved annually, at this mileage.
What one full charge costs
$11.3 — that's what Ohio's 18.53¢/kWh rate puts on the 61 kWh a 2026 Toyota bZ (energy capacity 200 Ah) needs for its full 236-mile EPA range.
Where this ranks
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Toyota bZ (energy capacity 200 Ah) in Ohio ranks 3,587 for cost savings versus gas — 1 being the best deal nationally. Separately, the Toyota bZ (energy capacity 200 Ah) ranks 10 of 400 EV models for raw efficiency, and Ohio ranks 34 of 51 for cheapest residential electricity.
Getting set up to charge a 2026 Toyota bZ (energy capacity 200 Ah) at home
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Ask a licensed Ohio electrician to quote the install before this math becomes a real decision.
More on how this number was built
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. At 18.53¢/kWh, Ohio sits in the middle of the national range — the guide to why charging cost varies by state shows where.