Oregon home charging cost for the 2027 Mercedes-Benz CLA250 Plus with EQ Tech
At Oregon's residential electricity rate of 15.31¢/kWh, a 2027 Mercedes-Benz CLA250 Plus with EQ Tech (rated 31 kWh per 100 miles by the EPA) costs $4.75 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home costs a fraction of what gas would here: 70.4% less than gas per mile, here specifically.
Annual cost, at 15 thousands miles a year
At fueleconomy.gov's default of 15,000 annual miles, the 2027 Mercedes-Benz CLA250 Plus with EQ Tech costs roughly $712 a year to charge at home in Oregon, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,691 a year.
Cost of a full charge
Covering the 2027 Mercedes-Benz CLA250 Plus with EQ Tech's EPA-rated 317-mile range takes about 98.3 kWh, which costs about $15.05 at Oregon's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.
How this compares nationally
This combination ranks 3,396 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Mercedes-Benz CLA250 Plus with EQ Tech alone ranks 73 of 400 models for efficiency; Oregon alone ranks 21 of 51 states for electricity price.
Next step: home charger installation
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Ask a licensed Oregon electrician to quote the install before this math becomes a real decision.
Where these figures come from
See the methodology guide for exactly which EIA and EPA figures feed 2027 Mercedes-Benz CLA250 Plus with EQ Tech's cost in Oregon. At 15.31¢/kWh, Oregon sits in the middle of the national range — the guide to why charging cost varies by state shows where.