ChargeCostFinder

What it costs to charge a 2027 Rivian R1T Quad (20in AT) in Oregon

In Oregon, home electricity runs 15.31¢/kWh — put a 2027 Rivian R1T Quad (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $7.67, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 52.1% cheaper per mile than gasoline in Oregon — charging at home is much cheaper than gas here.

Annual cost, at 15 thousands miles a year

Home charging this 2027 Rivian R1T Quad (20in AT) in Oregon runs about $1,151 over fueleconomy.gov's default 15,000 annual miles, versus about $2,403 for the gasoline equivalent. Call it about $1,252 saved annually, at this mileage.

What one full charge costs

$24.93 — that's what Oregon's 15.31¢/kWh rate puts on the 162.8 kWh a 2027 Rivian R1T Quad (20in AT) needs for its full 325-mile EPA range.

2027 Rivian R1T Quad (20in AT) in Oregon, ranked

Among all 20,400 state-and-model combinations this site tracks, charging a 2027 Rivian R1T Quad (20in AT) in Oregon ranks 14,527 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1T Quad (20in AT) ranks 391 of 400 EV models for raw efficiency, and Oregon ranks 21 of 51 for cheapest residential electricity.

Next step: home charger installation

Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.

Line up a few Oregon electrician quotes for Level 2 install before you commit either way.

More on how this number was built

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Curious how Oregon's 15.31¢/kWh compares? The guide to charging cost by state ranks every state side by side.