2026 Jeep Recon MOAB 4WD: home charging cost in Tennessee

At Tennessee's residential electricity rate of 13.9¢/kWh, a 2026 Jeep Recon MOAB 4WD (rated 47.6 kWh per 100 miles by the EPA) costs $6.61 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home is much cheaper than gas here: 58.7% less than gas per mile, here specifically.

Annual cost, at 15 thousands miles a year

Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Jeep Recon MOAB 4WD charged at home in Tennessee costs about $992/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,411 a year.

Cost of a full charge

A 2026 Jeep Recon MOAB 4WD needs roughly 105.6 kWh to reach its EPA-rated 222-mile range, which runs about $14.68 at 13.9¢/kWh in Tennessee.

How this compares nationally

This combination ranks 11,912 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Jeep Recon MOAB 4WD alone ranks 376 of 400 models for efficiency; Tennessee alone ranks 13 of 51 states for electricity price.

Next step: home charger installation

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Ask a licensed Tennessee electrician to quote the install before this math becomes a real decision.