Charging a 2026 Rivian R1S Performance Dual Max (22in) at home in Tennessee
In Tennessee, home electricity runs 13.9¢/kWh — put a 2026 Rivian R1S Performance Dual Max (22in)'s EPA-rated 39.9 kWh/100mi against that and 100 miles costs $5.55, versus $16.02 for a gas car averaging 25.5 mpg. That works out to 65.3% cheaper per mile than gasoline in Tennessee — charging at home costs a fraction of what gas would here.
Annual cost, at 15 thousands miles a year
Tennessee owners putting 15,000 annual miles on a 2026 Rivian R1S Performance Dual Max (22in) spend about $833 on home electricity, compared to about $2,403 a gas-car equivalent would spend on fuel. Call it about $1,570 saved annually, at this mileage.
Filling up the 2026 Rivian R1S Performance Dual Max (22in), in dollars
At Tennessee's rate, fully covering this 2026 Rivian R1S Performance Dual Max (22in)'s 410-mile EPA range costs about $22.76 (163.7 kWh) — the energy the EPA test actually used, not the battery's rated size.
How this compares nationally
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Rivian R1S Performance Dual Max (22in) in Tennessee ranks 7,294 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1S Performance Dual Max (22in) ranks 266 of 400 EV models for raw efficiency, and Tennessee ranks 13 of 51 for cheapest residential electricity.
Getting set up to charge a 2026 Rivian R1S Performance Dual Max (22in) at home
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Ask a licensed Tennessee electrician to quote the install before this math becomes a real decision.
More on how this number was built
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Tennessee's 13.9¢/kWh rate ranks 13 of 51 states; the state rate guide lays out the full spread.