ChargeCostFinder

2026 Rivian R1S Quad Max (22in UHP), TX Charging Cost

Texas home charging cost for the 2026 Rivian R1S Quad Max (22in UHP)

At Texas's residential electricity rate of 16.11¢/kWh, a 2026 Rivian R1S Quad Max (22in UHP) (rated 47.3 kWh per 100 miles by the EPA) costs $7.63 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home is much cheaper than gas here: 52.4% less than gas per mile, here specifically.

2026 Rivian R1S Quad Max (22in UHP): yearly cost in Texas

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Rivian R1S Quad Max (22in UHP) costs roughly $1,144 a year to charge at home in Texas, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,259 a year.

Cost of a full charge

Covering the 2026 Rivian R1S Quad Max (22in UHP)'s EPA-rated 338-mile range takes about 160 kWh, which costs about $25.78 at Texas's residential rate, figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

How this compares nationally

This combination ranks 14,445 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1S Quad Max (22in UHP) alone ranks 373 of 400 models for efficiency; Texas alone ranks 28 of 51 states for electricity price.

Next step: home charger installation

The numbers above assume Level 2 home charging is already in place, the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Get quotes from local electricians for Level 2 charger installation in Texas before deciding.

Where these figures come from

The methodology guide names the exact EIA and EPA tables behind this page's numbers. At 16.11¢/kWh, Texas sits in the middle of the national range, the guide to why charging cost varies by state shows where.