2026 Rivian R1T Quad Max (20in AT), UT Charging Cost
2026 Rivian R1T Quad Max (20in AT): home charging cost in Utah
In Utah, home electricity runs 13.17¢/kWh, put a 2026 Rivian R1T Quad Max (20in AT)'s EPA-rated 50.1 kWh/100mi against that and 100 miles costs $6.6, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 58.8% less than gas per mile, here specifically.
What a year of driving costs
Driving 15,000 miles a year, fueleconomy.gov's own default assumption, a 2026 Rivian R1T Quad Max (20in AT) charged at home in Utah costs about $990/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,413 a year.
What one full charge costs
A 2026 Rivian R1T Quad Max (20in AT) needs roughly 162.8 kWh to reach its EPA-rated 325-mile range, which runs about $21.45 at 13.17¢/kWh in Utah.
Where this ranks
This combination ranks 11,845 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1T Quad Max (20in AT) alone ranks 393 of 400 models for efficiency; Utah alone ranks 4 of 51 states for electricity price.
Getting set up to charge a 2026 Rivian R1T Quad Max (20in AT) at home
The numbers above assume Level 2 home charging is already in place, the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Get quotes from local electricians for Level 2 charger installation in Utah before deciding.
Where these figures come from
Every figure on this page traces to a named EIA or EPA dataset, see the methodology guide. Utah is one of the cheapest states for home electricity, the guide to why the cost varies so much by state covers what drives that.