2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22): home charging cost in Virginia
At Virginia's residential electricity rate of 16.69¢/kWh, a 2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22) (rated 27 kWh per 100 miles by the EPA) costs $4.51 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home costs a fraction of what gas would here: 71.9% less than gas per mile, here specifically.
2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22): yearly cost in Virginia
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22) charged at home in Virginia costs about $676/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,727 a year.
What one full charge costs
A 2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22) needs roughly 101 kWh to reach its EPA-rated 374-mile range, which runs about $16.85 at 16.69¢/kWh in Virginia.
How this compares nationally
This combination ranks 2,469 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Mercedes-Benz CLA250 Plus with EQ Tech (R22) alone ranks 18 of 400 models for efficiency; Virginia alone ranks 31 of 51 states for electricity price.
Getting set up to charge a 2027 Mercedes-Benz CLA250 Plus with EQ Tech (R22) at home
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Get quotes from local electricians for Level 2 charger installation in Virginia before deciding.
Where these figures come from
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. At 16.69¢/kWh, Virginia sits in the middle of the national range — the guide to why charging cost varies by state shows where.