2026 Rivian R1T Dual Max (20in): home charging cost in Virginia
In Virginia, home electricity runs 16.69¢/kWh — put a 2026 Rivian R1T Dual Max (20in)'s EPA-rated 42 kWh/100mi against that and 100 miles costs $7.01, versus $16.02 for a gas car averaging 25.5 mpg. Charging at home is much cheaper than gas here: 56.3% less than gas per mile, here specifically.
2026 Rivian R1T Dual Max (20in): yearly cost in Virginia
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Rivian R1T Dual Max (20in) charged at home in Virginia costs about $1,051/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,352 a year.
Cost of a full charge
A 2026 Rivian R1T Dual Max (20in) needs roughly 159.5 kWh to reach its EPA-rated 380-mile range, which runs about $26.62 at 16.69¢/kWh in Virginia.
How this compares nationally
This combination ranks 13,084 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1T Dual Max (20in) alone ranks 300 of 400 models for efficiency; Virginia alone ranks 31 of 51 states for electricity price.
Getting set up to charge a 2026 Rivian R1T Dual Max (20in) at home
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Ask a licensed Virginia electrician to quote the install before this math becomes a real decision.
Where these figures come from
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. At 16.69¢/kWh, Virginia sits in the middle of the national range — the guide to why charging cost varies by state shows where.