2026 Rivian R1S Quad Max (22in): home charging cost in West Virginia
A 2026 Rivian R1S Quad Max (22in) draws 44.4 kWh per 100 miles per the EPA; at West Virginia's 15.42¢/kWh residential rate that's $6.84 per 100 miles charged at home, versus $16.02 for a 25.5-mpg gas car covering the same distance. Charging at home is much cheaper than gas here: 57.3% less than gas per mile, here specifically.
2026 Rivian R1S Quad Max (22in): yearly cost in West Virginia
Driving 15,000 miles a year — fueleconomy.gov's own default assumption — a 2026 Rivian R1S Quad Max (22in) charged at home in West Virginia costs about $1,026/year in electricity, against about $2,403/year for the gas-car comparison. That's a savings of about $1,377 a year.
Filling up the 2026 Rivian R1S Quad Max (22in), in dollars
A 2026 Rivian R1S Quad Max (22in) needs roughly 166 kWh to reach its EPA-rated 374-mile range, which runs about $25.59 at 15.42¢/kWh in West Virginia.
How this compares nationally
This combination ranks 12,632 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Rivian R1S Quad Max (22in) alone ranks 350 of 400 models for efficiency; West Virginia alone ranks 24 of 51 states for electricity price.
Before you install a home charger in West Virginia
The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.
Ask a licensed West Virginia electrician to quote the install before this math becomes a real decision.
Where these figures come from
See the methodology guide for exactly which EIA and EPA figures feed 2026 Rivian R1S Quad Max (22in)'s cost in West Virginia. At 15.42¢/kWh, West Virginia sits in the middle of the national range — the guide to why charging cost varies by state shows where.