What it costs to charge a 2026 Rivian R1T Quad Max (20in AT) in West Virginia
At West Virginia's residential electricity rate of 15.42¢/kWh, a 2026 Rivian R1T Quad Max (20in AT) (rated 50.1 kWh per 100 miles by the EPA) costs $7.73 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. That works out to 51.8% cheaper per mile than gasoline in West Virginia — charging at home is much cheaper than gas here.
What a year of driving costs
Home charging this 2026 Rivian R1T Quad Max (20in AT) in West Virginia runs about $1,159 over fueleconomy.gov's default 15,000 annual miles, versus about $2,403 for the gasoline equivalent. Call it about $1,244 saved annually, at this mileage.
What one full charge costs
$25.11 — that's what West Virginia's 15.42¢/kWh rate puts on the 162.8 kWh a 2026 Rivian R1T Quad Max (20in AT) needs for its full 325-mile EPA range.
How this compares nationally
Among all 20,400 state-and-model combinations this site tracks, charging a 2026 Rivian R1T Quad Max (20in AT) in West Virginia ranks 14,622 for cost savings versus gas — 1 being the best deal nationally. Separately, the Rivian R1T Quad Max (20in AT) ranks 393 of 400 EV models for raw efficiency, and West Virginia ranks 24 of 51 for cheapest residential electricity.
Next step: home charger installation
Everything above is the per-mile and per-year cost once a home charger exists — getting one installed is a separate electrical job whose price depends on your panel and wiring, not the state average used here.
Ask a licensed West Virginia electrician to quote the install before this math becomes a real decision.
More on how this number was built
Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. West Virginia's 15.42¢/kWh rate ranks 24 of 51 states; the state rate guide lays out the full spread.