ChargeCostFinder

Wyoming home charging cost for the 2026 Toyota bZ AWD

At Wyoming's residential electricity rate of 13.88¢/kWh, a 2026 Toyota bZ AWD (rated 28 kWh per 100 miles by the EPA) costs $3.89 to drive 100 miles on home charging, against $16.02 for the same distance in a car averaging 25.5 mpg on gasoline at $4.085/gallon. Charging at home costs a fraction of what gas would here: 75.7% less than gas per mile, here specifically.

What a year of driving costs

At fueleconomy.gov's default of 15,000 annual miles, the 2026 Toyota bZ AWD costs roughly $583 a year to charge at home in Wyoming, against roughly $2,403 a year for an equivalent gas car. That's a savings of about $1,820 a year.

Filling up the 2026 Toyota bZ AWD, in dollars

Covering the 2026 Toyota bZ AWD's EPA-rated 288-mile range takes about 80.6 kWh, which costs about $11.19 at Wyoming's residential rate — figured from the EPA's own combined range and consumption numbers, not the pack's nameplate capacity.

2026 Toyota bZ AWD in Wyoming, ranked

This combination ranks 723 of 20,400 state/model pairs for cost savings against gas (1 is cheapest). The Toyota bZ AWD alone ranks 27 of 400 models for efficiency; Wyoming alone ranks 12 of 51 states for electricity price.

Getting set up to charge a 2026 Toyota bZ AWD at home

The numbers above assume Level 2 home charging is already in place — the electrical work behind that is a real, separate cost that varies by panel, wiring, and local labor rates, not something this page's per-mile math includes.

Line up a few Wyoming electrician quotes for Level 2 install before you commit either way.

Where these figures come from

Every figure on this page traces to a named EIA or EPA dataset — see the methodology guide. Wyoming's 13.88¢/kWh rate ranks 12 of 51 states; the state rate guide lays out the full spread.